Analisis Keseimbangan Lintasan pada Lantai Produksi CV. Bobo Bakery
Abstract
An industry always expected to operate more efficiently in order to still be able to compete with other industries. One effort efficiency to do is to minimize the number of work stations, especially on the assembly work station path balancing method of production used the method ranked positional weight (RPW). The observations made in the data collection as much as 20 times each station observed and calculated test the adequacy and uniformity of data that can be obtained by standard time. From the data processing method RPW shows increased production efficiency is 35% at the starting position and following a path balancing the production efficiency of up to 83% due to, among others, the incorporation of several work stations where the initial conditions account for 7 stations and after the merger becomes 3 work stations, while initial jobless 2.97 to 0.33 this means that there is a decrease of 2.64 minutes. Initial wait time balance 64.28% to 16.6%, this means that there is a decrease of 47.68%. The balance of the track on the floor CV. Bobo's Bakery requires improved methods of work, laying machines with operators who have good skills in order to facilitate the operator's work in order to obtain the balance of the production trajectory.Keywords: Line Balancing, Wait Time,Eficiency
References
Baroto T. Perencanaan Line Balancing Guna Meningkatkan output Produksi. Optimumm Vol. 2 No. 1
Hal 108-116.
Gaspersz V. Production Planning and Inventory Control. Jakarta: PT Gramedia Pustaka Utama. 2005
Kusuma H. Manajemen Produksi, Perencanaan dan Pengendalian Produksi. Yogyakarta: Penerbit
Andi. 2009.
Maryati, “Perancangan keseimbangan lintasan untuk meningkatkan efisiensi kerja dengan
menggunakan metode RPW”[online] available http://okeita-oke.blogspot.com/2010/04/linebalancing.
html. (Diakses 12 juni 2012)
Noviyanto. Analisis Keseimbangan Lintasan dengan menggunakan Metode Ranked Positional Weight
(Studi Kasus Pada PT.Wisanka Klaten). Surakarta: Universitas Muhammaddiyah Surakarta: Tugas
Akhir; 2005.
Pratikto, Octavia T. Keseimbangan Lintasan Tipe U-Line Assembly Pada Perakitan Pompa Air. Jurnal
Teknik Industri. 2009; 11(1): 43-50.
Roy D, Khan D. Assembly Line Balancing to Minimize Balancing Loss and System Loss. Journal
Industrial Engineering International. ISSN: 1735-5702. 2010; 6(11): 1-5
Wahyu,“Samplingkerja”.[online].Availablehttp:pengukuran+waktu+kerja+denganm+sampling+kerja&ie
=utf-8&oe=utf-8&aq=t&rls=org.mozilla:id,html. . (Diakses: 03 juni 2012)