Analysis on Construction Cost Estimation Ministry Regulation Year 2016 and Year 2022 for Construction Projects
DOI:
https://doi.org/10.24014/sitekin.v20i2.21790Abstract
Cost is one of the 3 most important project management components, with the other two being Quality and Time. The calculation of construction work costs in detail is regulated in Indonesia by a Ministry Regulation. This Ministry Regulation has only undergone changes in 2022, which replaces and/or fixes several existing rules in the previous Regulation issued in 2016. For brevity, the two Regulations is shortened to regulation 2016 and regulation 2022. Of course, the accuracy of these regulations is especially important regarding the smooth implementation of projects. This study uses the two Ministry Regulations on two different Construction Projects to see analyse the different result of cost calculation caused by the regulation change. This change itself is important to be understood to continuously improve the Ministry Regulation regarding cost estimation. In conclusion, regulation 2022 can produce a more accurate results, with regulation 2016 often gives a higher cost estimation than regulation 2022. For future research it is best to analyse other type of construction infrastructure to gain more insight into which estimation that can still be improved in the future.
References
Project Management Institute, "Success in disruptive times: expanding the value delivery landscape to address the high cost of low performance. In Pulse of the Profession.," 2018. [Online]. Available: https://www.pmi.org/learning/thought-leadership/pulse/pulse-of-the-profession-2018.
P. A. Eman, L. Elisabeth and F. Jansen, "Estimasi Biaya Konstruksi Menggunakan Metode Parameter Pada Proyek Pemeliharaan Berkala Jalan Di Kota Manado," Jurnal Ilmiah Media Engineering, vol. 8, no. 2, 2018.
M. W. Fazil, C. . K. Lee and P. F. M. Tamyez, "Cost Estimation Performance In The Construction Projects: A Systematic Review And Future Directions," International Journal Of Industrial Management (Ijim), vol. 11, no. 1, pp. 217-234, 2021.
R. D. Yap, Analisa Perbandingan Harga Satuan Pekerjaan Berdasarkan Metode SNI dengan Biaya Produktivitas Tenaga Kerja di Lapangan., Bali: Universitas Udayana, 2015.
A. N. a. N. E.N.Hidayah, "Studi Komparasi Analisis Harga Satuan PekerjaanJalan Kabupaten Metode K danAHSP," The 9th UniversityResearch Colloqium 2019, p. 88, 2019.
Kementerian Pekerjaan Umum dan Perumahan Rakyat, Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 1 Tahun 2022 tentang Pedoman Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat, Jakarta, 2022.
B. Pilutomo and H. R. Agustapraja, "Perbandingan Estimasi Anggaran Biaya Antara Metode Bow, Sni Dan Perhitungan Kontraktor," JUTEKS - JURNAL TEKNIK SIPIL, vol. 5, no. 1, pp. 55-66, 2020.
S. A. Widodo, K. Yakin and W. A. Nugroho, "Analisis Perbandingan Nilai Proyek Dengan Standar Nasional Indonesia (SNI) dan Harga Satuan Pokok Kegiatan (HSPK) (Studi Kasus: SDN Kedung Cowek Baru)," Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, vol. 3, no. 1, 2020.
N. Alami, U. A. Aziz and D. Margiarti, "Studi Komparasi Perbandingan Rencana Anggaran Biaya Antara Metode Analisa Harga Satuan Pekerjaan (AHSP) Dan Standar Nasional Indonesia (SNI)," Jurnal Surya Beton, vol. 3, no. 1, 2021.
S. F. Yanuar, N. S. Rizal and T. Abadi, Jurnal Rekayasa Infastruktur HEXAGON, vol. 7, no. 1, 2022.
A. Wahyuningtyas and S. Wacono, "Perbandingan Analisis Harga Satuan Pekerjaan Dinding Proyek Royal Sentul Park," in Seminar Nasional Teknik Sipil Politeknik Negeri Jakarta, Jakarta, 2019.
A. O. Putri, N. B. Prihutomo and E. Pramono, "Analisis Harga Satuan Pekerjaan Pelapisan Ulang Ac-Wc Ruas Tol Jagorawi," Construction and Material Journal, vol. 3, no. 3, 2021.
Sugiyono, Metode Penelitian Kuantitatif Kualitatif dan R&D, Bandung: Alfabeta Bandung, 2019.
S. Hyun-Ji, J. Ahn, H.-S. Lee and K. Han, "Cost Estimation Model Using Modified Parameters for Construction Projects," Hindawi Advances in Civil Engineering, vol. 2019, 2019.
Kementerian Pekerjaan Umum dan Perumahan Rakyat, Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 28/PRT/M/2016 Tahun 2016 tentang Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum, Jakarta: Kementerian PUPR, 2016.
M. Fajar, Analisis Perbandingan Biaya dan Waktu Pengecoran Menggunakan Concrete Pump dan Concrete Bucket, Yogyakarta: Universitas Islam Indonesia., 2019.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License
Copyright Notice
An author who publishes in the SITEKIN Journal agrees to the following terms:
- Author retains the copyright and grants the journal the right of first publication of the work simultaneously licensed under the Creative Commons Attribution-ShareAlike 4.0 License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal
- Author is able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book) with the acknowledgement of its initial publication in this journal.
- Author is permitted and encouraged to post his/her work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of the published work (See The Effect of Open Access).
Read more about the Creative Commons Attribution-ShareAlike 4.0 Licence here: https://creativecommons.org/licenses/by-sa/4.0/.